There was a small problem with the solar panels- they had installed the frame work on the porch roof- where they were not supposed to be. They will be moving those this week. Also coming...are dark gray shutters and a white railing around the wrap around porch, in the front. My beige color, garage doors were a special order color, but it was worth it.
Last week, they did the back steps and ramp. They still need to build the stairway from the top balcony to the bottom.
This gray/beige tile floor on the top balcony is beautiful.
Three of the bathroom counter tops were in- mom's bathroom and the two upstairs bathrooms.
One of the perks of 6 inch exterior walls is great windows sills. Outside this window you can see the solar panel brackets, that aren't staying there, on the porch roof :(
Kitchen appliances will be installed this week. My oven, microwave, cook top, refrigerator, and dishwasher were all there- still in a box :) Kitchen counter tops scheduled for October 14.
Here is the elevator :) Should be put together and installed soon.




No comments:
Post a Comment